SW/NW 80th/70th Ave Preliminary Engineering

Share & Bookmark, Press Enter to show all options, press Tab go to next option
Print

Commission workshop presentation slides.  (June 7, 2021)

Neighborhood meeting's presentation slides.  (July 14, 2021)


Here's a glimpse of GDC's next possible steps.

Existing roadway:
Existing roadway no bike lane

Option 1:
Road project option one separate multi use lane

Option 2:
Road project option two attached bike lane


SW 80th Ave project - south of SR40


Project area:
Map 80th Ave south phase

Note: The larger file size of the below images may cause slower download times.
Alignment comparison - SW 90th St to SW 38th St:
Road project exhibit 1

Alignment comparison - SW 38th St to SR 40:

Road project exhibit 2


NW 80th Ave project - north of SR40


Project area:
Map of 80th Avenue project north phase

Note: The larger file size of the below images may cause slower download times.
Alignment comparison - SR 40 to NW 21st St:
Road project exhibit 2

Alignment comparison - NW 21st St to north of Highway 27:

Road project exhibit 3 Alignment comparison